C & J Painting

C & J Painting C & J Painting C & J Painting

C & J Painting

C & J Painting C & J Painting C & J Painting
  • Home
  • Services
  • About Us
  • Contact Us
  • More
    • Home
    • Services
    • About Us
    • Contact Us
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Services
  • About Us
  • Contact Us

Account

  • Bookings
  • My Account
  • Sign out

  • Sign In
  • Bookings
  • My Account

About Us

Experienced and Creative Painters

As a premier painting contractor, we are committed to delivering customer service that is second to none. We offer a wide range of services to meet your residential and commercial painting needs. Big job or small, we have you covered.

We Care About the Details

We strive to provide honest, reliable, residential and commercial painting services that stand head and shoulders above the rest. We combine the industry's best paint with our passion for detail to exceed your expectations. 

Customer Satisfaction Guaranteed

We work around your busy schedule and consult with you on all aspects of color selection and color coordination for your project to ensure that the project is completed according to your preferences. 

Frequently Asked Questions

Please contact us if you cannot find an answer to your question.

It includes a breakdown of time required, paint and labor estimate, and a list of things that you can do before we arrive to ensure that things can go as quickly and smoothly as possible.


A good paint job can last anywhere from 5 to 10 years. Stucco lasts a little bit longer, while wood expands and contracts, creating faster wear and tear on the paint surface.


We have all licenses and insurance require for our area. 


Standard Package starts with priming all drywall. Then finishing ceilings and closets in flat finish. All walls are finished in Flat/Matte sheen unless specified by builder, or homeowner. Window trim and woodwork is finished in Satin or Semi Gloss sheen. Allowance is 3 colors (main area, bathrooms, bedrooms) are in the standard package and each additional color adds a $200 upcharge.


Standard package includes spot priming any bare areas. 2 finish coats. Benjamin Moore product to be used on exterior surfaces. Starting rates are $6 a square feet.  Example, if your house is a 2,000sq/ft living space of the house the minimum charge to complete work starts at $12,000 and includes all labor and paint and a seem less process from A-Z.


 

Project Type: Single-Family New Build (3,000–4,000 SF)
Total Duration: ~17–18 Weeks
Goal: Zero rework, clean inspections, protected finishes

PHASE 1 — SITE & STRUCTURE (Weeks 1–5)

Week 1–2
• Excavation
• Footings
• Foundation walls
• Waterproofing & drain tile
• Backfill

Week 3–5
• Framing (walls, floors, roof)
• Trusses & sheathing
• Windows & exterior doors
• Weather-tight “dry-in”

PHASE 2 — ROUGH-INS (Weeks 6–8)

Week 6–7
• Plumbing rough
• Electrical rough
• HVAC rough
• Low-voltage (if applicable)
• Rough inspections

Week 8
• Insulation (batts / spray foam)
• Fire blocking
• Energy inspection

PHASE 3 — DRYWALL & CORE PAINT (Weeks 9–11)

Week 9
• Hang drywall
• Tape & mud (multiple coats)
• Final sanding

Week 10–11
• Full prime (spray + back-roll)
• Sand & caulk
• Paint ceilings
• Paint trim & doors
• Paint walls
• Initial paint punch

PHASE 4 — HARD FINISHES (Weeks 12–14)

Week 12
• Tile (showers, baths)
• Hardwood / LVP installation
• Floor protection installed

Week 13
• Kitchen cabinets
• Vanities
• Built-ins

Week 14
• Countertop template
• Countertop fabrication
• Countertop install

PHASE 5 — FINISH MECHANICALS (Weeks 15–16)

Week 15
• Plumbing trim (fixtures, toilets)
• Electrical trim (devices, lighting)
• HVAC registers & thermostats
• Appliances

Week 16
• Finish carpentry
• Baseboards
• Door hardware
• Closet systems
• Stair rails

PHASE 6 — FINALIZATION & TURNOVER (Weeks 17–18)

Week 17
• Final paint touch-ups
• Trade punch list completion

Week 18
• Final inspections
• Certificate of Occupancy
• Final clean
• Owner walkthrough
• Project close-out

GC QUALITY RULES (NON-NEGOTIABLE)

• Paint before flooring
• Full prime required
• Hard finishes before soft
• Protect completed work
• No overlapping trades without GC approval


Copyright © 2026 C & J Painting  - All Rights Reserved.

  • Privacy Policy

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept